Greener premises

Since 2006 we have been gradually reducing the carbon footprint of our premises.
Below is a summary of our current and proposed achievements.

 

COMPLETED SINCE 2006

  • PV solar panels approx 15 kw system
  • 2 solar water heating systems
  • New high efficiency gas boiler
  • High frequency lighting with triphosphur tubes
  • 'Air blades' installed
  • 2 new gas central heating condensing boilers
  • Insulation upgrade to premises
  • Replaced air conditioning with evaporative cooling system
  • Set up tax free cycle to work scheme
  • All our grid electricity is supplied from renewable sources
  • Additional 10 kw of PV solar power installed Jan 2011
ON GOING
  • Continue to increase our recycling activity (as of June 2010, 90%+ of our waste/by-products are recycled)
  • Ensure all plant and equipment operates at maximum efficiency
  • Reduce fuel consumption of company vehicles
  • Recommending low energy sign illumination solutions to customers
FUTURE
  • Installation of water harvesting facility during 2012
  • Encourage suppliers & sub-contractors to join us in becoming more environmentally aware
  • Continue improvements to insulation of premises
  • During 2011/12 replacement of factory lighting with LED system
  • Acquisition of Electric Vehicle for local use